Clean plant construction methods can be divided into two kinds of construction planning and assembly, during assembly type widely used.
Fabricated clean plant system consists of early, middle and high levels of air filtration, air-conditioned air return air and exhaust systems; power and lighting systems; operating fire alarm monitoring environmental parameters and communication systems; passenger and logistics systems; skills tube road system; maintenance planning and other aspects of static ground disposal of the implementation of the required content, forming air purification systems engineering contains the entire device and ancillary equipment and construction equipment content.
Equipment and the use of:
1 full clean plant assembled in the factory to repair components modulus and a series of joint processing ends, suitable for mass production, stable quality, supply active;
2 motorized active, namely the right equipment at the new plant, but also the right skills purification old plant transformation. Repair plan can also be combined with the skills needed to enjoy, open lunch;
3 Need assisted construction area is small, decorative earthen architecture needs for low;
4 Airflow organization active, rational, can meet a variety of operating environments, not the same level of cleanliness required
本文共分 1 页